Beijing National Grand Theater


The massive reticulated shell area reaches 35,000 square meters, and the total weight of the steel structure is about 6,750 tons. Its installation difficulty and technical requirements are unprecedented in the history of domestic super-large structure installation. The project won the Beijing Great Wall Cup high-quality structure gold medal.
--- Use "first center, back radiation, balanced symmetry" of the installation of running water;
--- The use of unique structure pre-deformation, balanced unloading control technology;
--- The research and development of the "China National Grand Theatre Shell Steel Structure Production, Installation Quality Acceptance Criteria" was approved by the China Steel Association and the Beijing Standard Office.