Oriental Pearl TV Tower
Shanghai Oriental Pearl TV Tower For the first time in China, digital control technology was used for the first time in the overall installation of large-scale structures. The 450-ton, 118-meter-long steel antenna mast was lifted to a 350-meter-high concrete cylinder and installed at an end of 468 meters. --- The installation of steel antenna masts adopts a series of new processes and technologies such as "cluster strand load-bearing, hydraulic jack lifting, computer synchronous control". |